Prior to begin the work, we developed a plan on how to layout the bathroom in order to optimize the space inside and to fit newly installed washing and drying machines. With plan on hands, the demolition was began. After, the floor was reinforced and new framing was built. Most importantly, all the wiring was redone and all the plumbing was relocated and replaced completely. A niche was built in the shower cabine and a shower rainfall was installed in the ceiling. Central vacuum cleaner was lodged in the wall with the outlet facing the living room. Having done all the interior finishing work, the appliances were installed and connected. The work was done in three weeks and the bathroom was ready for use right away.